Creating Relationships That Build and Improve Communities
Commercial Construction
The Construction Division’s history goes back to the very beginning of Hampton Enterprises in 1947. Throughout that time we have constructed nearly every type of building: laboratories, schools, movie theaters, arenas, manufacturing facilities, hospitals, dental, medical, churches, grocery stores, restaurants, retail and offices. In addition to new construction, Hampton has renovated or constructed additions to hundreds of these same types of buildings across Nebraska and built out space for countless tenants or other lessee’s using our dedicated tenant finish team.
The most common concerns people have when they are considering constructing a building is how long will it take, how much will it cost and how do they know they’re getting a quality building. We’ve designed our processes around those very questions. We are committed to delivering the best possible quality for a reasonable price as well as providing accurate budgets and realistic schedules for every project to minimize or eliminate negative surprises.
Hampton has the feel of a homegrown company but with the benefit of the experience, expertise and best practices of companies dozens of times larger. At the end of the day we still hold ourselves to Joe’s standard, and doing things The Hampton Way, by asking, “Did we build this as if we built it for ourselves?”
Our Services
Regardless of whether you are constructing a new building or addition, renovating an existing building or completing a tenant finish - the means, or delivery method, by which the project is designed and constructed is an important consideration prior to beginning a project. Your decision will have a significant impact on cost, risk and the overall schedule.
The sections below describe the most commonly used types of project delivery methods – all of which are offered by Hampton.
Design-Bid-Build (DBB)
The DBB delivery method is the “traditional” means of delivering a construction project. Typically the only criteria for selection of a contractor in DBB projects is the lowest construction price. This method is also often referred to as low-bid or hard-bid.
The DBB method is typically the most familiar to those in the industry. In theory it has the ability to deliver a low-cost project. However, since this method isolates the contractor from the design process, there is a high potential for project cost increases as well as construction delays due to conflicts between the design documents and the constructability of the project in the field. Also, selecting a low bidder can result in a decrease in the quality of the finished product, as the contractor must often determine ways of achieving a profit on the job, working under a budget that was the lowest of all contractors submitting pricing.
In general, the DBB process is best used on projects that are simple and not under a tight time crunch.
Sandy Loy, President of Construction Plus, Inc. says about DBB “It costs more, takes longer and statistically creates more litigation than other options. It is a series of adversarial relationships waiting to happen.”
Construction Manager (CM)
Construction Manager, sometimes referred to as At Risk (CM-R) is a relatively new type of project delivery method. Using this method, the owner selects a “Construction Manager” (CM) who is responsible for building the project. The selection of the CM is made using criteria such as quality, proven track record, detailed project approach and ability to meet the schedule of the project more so than just construction cost.
The selected CM becomes a project team member early on in the project process and, working directly with the owner and the architects and engineers, provides input as the project moves through design into construction - input on items such as project budget, construction cost estimating and the overall schedule as well as providing review of design drawings to identify constructability issues and potential cost savings. Typically the pricing of the construction is begun early in the design process, and is refined as the design progresses with a final guaranteed maximum price (GMP) provided to the owner prior to beginning of construction.
The CM process is most successful in projects that require high quality and are under pressure to finish in a limited time. This process may also be applicable to some projects that involve complex integration between disciplines or multiple phases of construction, where the oversight and coordination delivered by a construction manager is extremely beneficial.
Hampton strongly advocates for the CM method because of the transparent nature of the contract (e.g. cost-plus based on actual invoices) and the early collaboration between owner, architect and contractor which results in a fewer surprises, faster construction schedule, which lowers cost and far better relationships during and after the completion of the project.
Design-Build (DB)
In a design-build project, the design and construction are contracted to a single company – typically the contractor. Since the team is responsible for both the design and the construction components, pricing changes are kept to a minimum, and are usually isolated only to those instances where unknown conditions or owner requests necessitate cost increases.
The DB method provides the ability to deliver a project on a tight schedule, as projects can be split up and delivered in a package approach, where individual components are designed and built as needed to achieve the final completion date. Generally the owner can establish a firm maximum price of the project early on, and has a significant amount of cost control.
Design build is typically used for construction projects where the owner has clearly established the requirements prior to design. It can also be an appropriate method when schedule is a concern, as it removes the components of the schedule that would typically be consumed by the bidding and procurement process.
Project Archive
Project Name
Location
Project Type
Cinema Twin - Remodel for Douglas Theaters
Lincoln, NE
Hospitality, Entertainment & Recreation
East Park 6 Theater
Lincoln, NE
Hospitality, Entertainment & Recreation
SouthPointe Theater
Lincoln, NE
Hospitality, Entertainment & Recreation
Starship 9 Theater
Lincoln, NE
Hospitality, Entertainment & Recreation
Project Gallery
Search
Filter by Industry
Filter by Tag
Filter by Delivery Method
Lincoln Public Schools District Office
Lincoln, NE
The District Office project had a set schedule (18 months) and a tight job site...
Adams Central Elementary School
Hastings, NE
This project consisted of a new 80,000 SF Elementary School directly East of the existing...
First Christian Church
Lincoln, NE
Remodel of sanctuary and Sunday school classrooms and gymnasium.
Liberty First, North 84th Street Branch
Lincoln, NE
Third branch for Liberty Credit Union. Brand new building from the ground up.
Peace Lutheran Church
Lincoln, NE
Indian Hills Community Church
Lincoln, NE
Indian Hills Community Church consisted of a 15,000 square foot auditorium/Sanctuary remodel. The remodel included...
Lincoln Public Schools - Irving Middle School
Lincoln, NE
The Irving project included the installation of a new geothermal mechanical system and the complete...
Liberty First Credit Union
Omaha, NE
Pinnacle Bank Arena
Lincoln, NE
The Pinnacle Bank Arena (PBA) in downtown Lincoln, NE was a joint-venture between Hampton Enterprises...
Sebastian's Table
Lincoln, NE
New tenant finish of restaurant space at Hampton’s GlynOaks Plaza development at 84th & GlynOaks...
Frontier Bank
Lincoln, NE
The new branch for Frontier Bank in GlynOaks Plaza was designed in accordance with the...
First Lutheran Church
Lincoln, NE
This project consisted of a new entrance, renovation of the existing worship sanctuary with a...
Lexington Regional Health Center
Lexington, NE
Nebraska Rural Electric Cooperative Association
Lincoln, NE
New 2 story brick facility for NRECA in Firethorn.
Freddy's Frozen Custard & Steakburgers
Multiple Locations
We have built four Freddy's restaurant locations since 2018. Each project was a brand new...
Cornhusker Bank - 40th & Old Cheney
Lincoln, NE
Holdrege Public Schools - Elementary School
Holdrege, NE
The new elementary school in Holdrege, Nebraska combined three older elementary schools across Holdrege. The...
Whitehead Oil - U-Stop Wildcat Drive
Lincoln, NE
New U-Stop convenience store at Wildcat Drive
Messiah Lutheran
Lincoln, NE
Cooper YMCA
Lincoln, NE
The Cooper YMCA in South Lincoln is a full-service facility including gymnasium, locker rooms, weight...
UNL Hamilton Hall Chemistry Lab
Lincoln, NE
The project included demolition of the existing space and renovation into laboratory (1,800 sf) and...
Union College - Krueger Center for Science & Mathematics
Lincoln, NE
Constructed on Union College's campus in Southeast Lincoln The Krueger Center for Science & Mathematics...
Pius X High School
Lincoln, NE
Project consisted of a two-story addition on the northwest corner of the existing school. This...
Marriott Residence Inn
Lincoln, NE
The Marriott Residence Inn constructed in the Village Gardens area of South Lincoln is a...
Fallbrook Family Dental
Lincoln, NE
The Fallbrook dental project was a tenant finish in suite 107 at 575 Fallbrook Boulevard
Lincoln Public Schools - Roper Elementary
Lincoln, NE
The Roper Elementary School project in Lincoln, NE consisted of a 45,000 square foot addition...
The Grand Theater
Lincoln, NE
Region V Services
Lincoln, NE
Region V Services had a very firm budget on this project which was initiated by...
Whole Foods
Lincoln, NE
The Whole Foods building was part of The District at O Street project and was...
Farmhouse Fraternity
Lincoln, NE
Demolition and replacement of the University of Nebraska - Lincoln FarmHouse Fraternity. The new building...
Whitehead Oil - U-STOP Hickman
Hickman, NE
The Hickman U-Stop brought a new concept to the U-Stop stores. The new store was...
St. John's Lutheran Church
Seward, NE
The St. John’s Sanctuary project included the installation of a new fire sprinkler system throughout...
Johnny Carson Center for Emerging Media Arts
Lincoln, NE
The project consisted of demolition and renovation of the former Nebraska Book Company building at...
Good Shepherd Lutheran
Lincoln, NE
This was actually two separate projects that were both completed in 2002. The project included...
First National Bank Omaha - SouthPointe
Lincoln, NE
New bank branch for First National Bank Omaha
Country Club of Lincoln - Pool Renovation
Lincoln, NE
Suraj's Place - Valero Convenience Store
Lincoln, NE
The Suraj's Place was a very unique project with gasoline pumps with a full canopy...
Tabitha - Rehabilitation Center
Lincoln, NE
Edgewood Theater - Remodel
Lincoln, NE
Lincoln Police Department Fleet Maintenance
Lincoln, NE
Saturn Car Dealership (now Moxie Mitsubishi)
Lincoln, NE
Bubbles and Blocks Child Development Center
Lincoln, NE
The GlynOaks Plaza facility is the second facility we have completed for Bubbles & Blocks...
Whitehead Oil - U-Stop 27th & Pine Lake
Lincoln, NE
New U-Stop convenience store at 27th & Pine Lake
Tabitha - Green House
Lincoln, NE
Veterans Affairs Regional Office - LEED Gold
Lincoln, NE
Located in Hampton’s own development, Williamsburg Village, Hampton Construction broke ground on the Veterans Affairs...
CHI Health - Good Samaritan Hospital
Kearney, NE
LincOne Federal Credit Union
Lincoln, NE
Immanuel Communities - Harbor House
Lincoln, NE
The Harbor House is a new senior living facility in Williamsburg Village. The project included...
Cabela's Worlds Foremost Bank
Lincoln, NE
The Project consists of the construction of a two-story addition in a walk-out configuration. The...
First National Bank - Beatrice
Beatrice, NE
New branch constructed for First National Bank Beatrice.
Woof!
Lincoln, NE
Dog daycare and dog draining facility with a veterinarian clinic in the building. The structure...
Viet Hao
Lincoln, NE
This project consisted of remodeling a 1918 building into a Asian Grocery store. Hampton demolished...
Whitehead Oil U-Stop 84th & Hwy 6
Lincoln, NE
The 84th & Hwy 6 U-Stop was, at that time, the largest U-Stop constructed by...
Bryant Elementary - Kearney Public Schools
Kearney, NE
Bryant Elementary School underwent two additions and a renovation to its existing site. A 1,14...
Russ's Market - Hastings
Hastings, NE
This project involved construction of a new Russ’s Market barely 20 feet behind an existing...
Southeast Community College and Lincoln Public Schools - The Career Academy
Lincoln, NE
The Career Academy (TCA) was a joint venture between Southeast Community College and Lincoln Public...
The District at O Street
Lincoln, NE
The District at O Street was a retail strip mall constructed around the same time...
Liberty First Credit Union - 46th & R
Lincoln, NE
NMPP Energy
Lincoln, NE
The new 2-level home for NMPP in GlynOaks Plaza provides office space, conference areas, and...
Kearney Public Schools - Kenwood Elementary School
Kearney, NE
The Kenwood Elementary project was a school completed in 2011. The project was built in...
Aurora Cooperative Administrative Headquarters
Aurora, NE
This project is a modified two-story building at the Leadership Center Campus in Aurora, Nebraska...
Archer Credit Union
Central City, NE
This project consisted of an addition for six new offices, a boardroom and a redesigned...
Capitol City Christian Church
Lincoln, NE
Addition of education wing to the church, new church entry and interior renovation.
UNICO Group Insurance
Lincoln, NE
UNICO Group’s new office space in the 3 Landmark Centre building consisted of very modern...
Lincoln Nephrology and Hypertension PC
Lincoln, NE
Lincoln Nephrology was a long-time tenant of Hampton's Property Division in Corporate Centre (7441 O...
Mourning Hope Grief Center
Lincoln, NE
Country Club of Lincoln
Lincoln, NE
Renovation of ballroom, patio, front entry to club, exercise facility and pro-shop. Wine cellar was...
Alivation
Lincoln, NE
The Alivation project involved finishing out the garden level of the building (which had not...
Liberty First Credit Union - 56th Street & Old Cheney
Lincoln, NE
Viewpoint Building - 70th & A
Lincoln, NE
The Viewpoint is a two-story brick building in LincolnShire Square at 70th & A. The...
Whitehead Oil - U-Stop 70th & Pioneers
Lincoln, NE
New U-Stop convenience store at S 70th and Pioneers Boulevard
“From the beginning of the project to the end, we have found Hampton to be extremely accommodating and professional in its performance. Hampton’s project managers always have updated cost information to me on a timely basis.”
Steven Greenberger
Director of Construction
Lincoln Gateway Mall
The Hampton team has been absolutely great to work with. They told us what they were going to do – they delivered on it. They also have been very attentive. We’ve never had to ask them to follow up on anything. We’re busy doing our job and they’re busy doing theirs and they are great to work with – absolutely.
Gary Stauffer
Executive Director
NMPP Energy
“Throughout the entire project cycle, Hampton was very responsive to client requests, issues, and concerns, even when doing so required additional resources and acceleration of the construction schedule to remain on track with an already aggressive occupancy plan. As the project progressed, it became clear to me that Mr. Hampton’s comment about customer service was completely true, and that customer satisfaction was indeed an overriding goal shared by everyone on the Hampton team.”
John Owens
Project Manager
Department of Veterans Affairs
“From the very beginning, we realized the enormous challenges in bringing in a successful completion of this near total renovations project. Concept drawings were brought to the table and Hampton helped to identify the work, develop a schedule and fine tune the budget. In the end, Hampton made promises that they kept. They brought the project in on time and under budget.”
Melinda Pearson, AIA
President of Pearson Architects
Country Club of Lincoln
"It was a pleasure to work with a contractor that operates with Integrity. Our business is built on connections and relationships we establish through taking care of our clients. In your commitment to our project, you reflected those same values. From returning calls and answering questions to your professional and timely response to our concerns, you showed that you cared."
J. Scott Nelson, CPCU, CWCA
President
UNICO Group, Inc.
"We have had good response from Hampton in addressing any issues. They were quick to accept calls from me and address issues that came up. I met every week with the superintendents. We have good communication. They have accommodated our needs, as we have theirs. It has been a good partnership, and as we said very early in the project, we have been good neighbors (and this goes both ways). They understand what can and cannot happen in the building, especially when students and staff are here. There has been give and take both ways, and a lot of compromising on both sides when possible."
Susette Taylor, Ph.D
former Principal
Lincoln Public Schools, Irving Middle School
"Hampton’s consistent and professional behavior post substantial completion confirmed to our management that that they meant it when they said they were committed to our project – and still continue to be."
Chris Holliday
Corporate Operations Manager
Aurora Cooperative
"The quality of work exemplified by Hampton is outstanding. The safety protocol and standards followed by Hampton and its subcontractors is top notch. Our new elementary building looks fantastic, beyond what we had envisioned. It is a place our students will be able to enjoy and benefit for generations to come, thanks to the quality craftsmanship of your company. Every detail has been taken care of. In addition to the quality building you are providing us, I want to thank you for the smooth construction process. Your company is an example of professionalism, demonstrated in every interaction with foremen and workers. Your communication with our district has been outstanding."
Shawn Scott
District Superintendent
Adams Central Public Schools
"I congratulate Hampton for delivering the finished building to Region V Services ahead of schedule and on budget. It is significant to have a project executed with zero change orders. The construction schedule was aggressive from the start, and regardless, your team was able to complete the building nearly a month in advance of the contract date for substantial completion. These achievements are a testament to the integrity of Hampton. I would not hesitate to recommend Hampton to clients in the future."
Patricia Birch, AIA, LEED AP
Senior Architect, Schemmer Architects, Engineers, Planners
Region V Services
"Hampton's quality of work was great. They built it the way we wanted it built. There was no deviating, just consistency and attention to detail. This is the first time we've used a company for this many projects in a row, and it really says something about Hampton's quality. We've found that they've been consistent and easy to work with, so we've kept using them."
Alex Carney
District Manager
Freddy's Frozen Custard & Steakburgers
"I would do another project with Hampton any day; it has been incredibly smooth. I appreciate the way Hampton employees did things right, paid attention to details and treated the building as if it was their own."
Dan Warnes
Lead Pastor
First Lutheran Church
"We knew this is not an easy project, and we needed a contractor that is knowledgeable and highly skilled. Hampton has been very informative and creative in the different construction approach to keep the cost from going up even higher."
Le Nguyen
Owner
Viet Hao
"Hampton was cooperative and responsive to our concerns and ideas. Their communication during the project was terrific. I would highly endorse Hampton for any project and hope to work with them on future projects."
Tom Korta
Principal
Pius X Catholic High School
NMPP Energy
Department of Veterans Affairs
Country Club of Lincoln
Lincoln Public Schools, Irving Middle School
Aurora Cooperative
Region V Services
First Lutheran Church
Viet Hao
Pius X Catholic High School